 m038andClaude Fable 5
|
94bfc53b90
|
docs(working): overnight pre-trip readiness audit + product ideation report
Audit: posting pipeline / auth / API surface review with prioritized P1-P3
findings and a morning checklist; P1-1 (prod 2M upload limit) marked
resolved 2026-07-09 via the CGI->FPM switch in Webmin. Ideation: 7 ranked,
repo-grounded ideas (top pick: OG meta + RSS follow-along stack).
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0195b3cDdMeize2Mm1FgC2aU
|
2026-07-09 17:59:05 +02:00 |
|